The green hills above Gangtok, reached from Siliguri on the NH-10 highway
Travel Essentials

NH-10 night closures, October to November 2026: the real dates, and what it means for your Sikkim trip

NH-10 between Sevoke and Rangpo, the main Siliguri to Sikkim highway, is shut to all vehicles at night for slope-protection work. The confirmed NHIDCL windows are 7 to 15 October and 26 October to 5 November 2026, each night 9 PM to 6 AM. The road is open all day. Here are the facts we checked, the viral graphic we did not trust, and what it means for your arrival.

Keshav DahalBy Keshav Dahal·05 Oct 2026·5 min read

If you are driving up to Sikkim over the next few weeks, this is the one road update worth knowing. NHIDCL is carrying out excavation, slope protection and landslide-mitigation work on the Sevoke to Rangpo stretch of NH-10, the lifeline road between Siliguri and Sikkim. To keep crews and vehicles safe, the highway is closed to all traffic through the night on the dates below. I handle permits and road logistics for our trips, so I will keep this simple: what is closed, when, and whether it changes anything for you.

PhaseDates (2026)Night closure
Phase 17 to 15 October9:00 PM to 6:00 AM
Phase 226 October to 5 November9:00 PM to 6:00 AM
Source: NHIDCL night-closure order for the Sevoke Coronation Bridge to Rangpo section of NH-10, issued under the Control of National Highways (Land and Traffic) Act, 2002. Applies to all vehicles. Daytime traffic runs normally. NHIDCL has said any further phases will be notified separately.

Does this affect your Sikkim trip? Mostly, no

For almost everyone, the honest answer is no. The closure is at night only, and nobody should be driving the Teesta valley after dark anyway. It is a narrow, landslide-prone road, and we plan every arrival and departure transfer to clear the Sevoke to Rangpo stretch well before 9 PM. If your Bagdogra flight or NJP train gets you to Siliguri by late afternoon, you reach Gangtok in good time and the closure never touches your trip.

If you land late in the evening

The one case that needs a small adjustment is a late-evening arrival into Bagdogra or NJP. If your flight lands after about 6 or 7 PM, there is not enough daylight left to clear the stretch before the 9 PM barrier, so we hold you overnight in Siliguri and start the drive up at first light. That adds a night at the bottom of the hill, not a cancelled trip. Tell us your flight or train number and we build the halt into your plan from the start, so you are never stuck at a closed barrier at midnight.

About the graphic doing the rounds

You may have seen a poster on social media with a 7 PM start time and closure dates running all the way to January 2027. We checked it against the actual NHIDCL order and the news reports. The official notice is 9 PM to 6 AM, and the confirmed phases are the two in the table above, ending 5 November. NHIDCL has said more phases may be announced later depending on how the work goes, which may be where the longer list came from, but those dates are not official yet. We would rather give you the confirmed facts than a forwarded graphic.

—Planning a Sikkim trip around these dates? Send us your arrival details and we will plan the transfer around the night closure.

Sources and updates

The dates and timings here are from the NHIDCL night-closure order for the Sevoke to Rangpo section of NH-10, as reported in October 2026 by ThePrint, Sikkim Express and other outlets: all vehicles, 9 PM to 6 AM, phases of 7 to 15 October and 26 October to 5 November, with any further phases to be notified separately. Road work in this belt can change at short notice, so we will update this page if NHIDCL extends or revises the schedule.

Frequently asked

Questions we get all the time

NH-10 between Sevoke and Rangpo is closed to all vehicles only at night, from 9:00 PM to 6:00 AM, on set dates for slope-protection work. It is open as normal during the day. The confirmed night-closure windows are 7 to 15 October and 26 October to 5 November 2026. Outside those nights and those hours, the road runs normally.

Share this note
Keep reading

More from the field

Explore

Plan your trip

From our desk in Gangtok

Want us to handle the paperwork?

Tell us your dates, your travel style, who you are travelling with. We will reply within a working day with a real itinerary — not a template.

Average response time: under 4 working hours